TM 1-5855-265-20
3-49
3-12. PNVS TURRET ASSEMBLY INSTALLATION
INITIAL SETUP
Tools
Aircraft armament repairman tool set
Aircraft armament technical inspector tool set
Maintenance platform (optional)
Acid-type safety goggles
Rubber apron
Rubber gloves
PNVS turret holding fixture
Torque wrench, 10-50 in-lb.
Materials (appendix D)
Brush, artist (Item 6)
Cloth, wiping (Item 7)
Corrosion inhibitive sealing and coating
compound (Item 10)
Film, chemical (Item 16)
Pad, cheesecloth (Item 24)
Paper, abrasive (Item 25)
Strap, tiedown (Item 29)
Tape, pressure sensitive (Item 32)
Trichlorotrifluoroethane (Item 35)
Personnel Required
68X Aircraft Armament/Electrical Repairer (2)
One person to assist
66J30 Aircraft Armament Technical Inspector
References
TM 1-5855-265-T
Equipment Conditions
Ref
Condition
Para 3-2
Premaintenance
proceduresperformed
FollowUp
Move TADS turret assembly into stow (para
3-4)
Perform MOC (TM 1-5855-265-T)
CAUTION
Do not drop any objects in cavity in top center
of aircraft interface assembly. Exposed TADS
optics in cavity can be damaged.
1. Remove environmental dust cover from
azimuth drive gimbal assembly (1) (para 3-19).
2. Move azimuth drive gimbal assembly (1) to
position shown.
1
310-011A