TM 1-1510-224-CL
FUSELAGE LEFT SIDE
1.
Fuselage left side - Check.
* INTERIOR CHECK
1.
Cargo/loose equipment - Check secured.
H2. Cabin/cargo doors - Test and lock.
3.
Emergency exit - Check secure and key removed.
4.
Mission cooling ducts - Check open and free of
obstructions.
5.
Flare/chaff dispenser preflight test - Completed.
6.
COMSEC keys - Loaded as required.
7.
Crew briefing - As required.
BEFORE STARTING ENGINES
* 1.
Oxygen system - Set as required.
2.
Circuit breakers - Check in.
* 3.
Overhead panel - Check and set.
* 4.
Fuel panel switches - Check.
5.
Magnetic compass - Check for fluid, heading, and
current correction card.
* 6.
Pedestal controls - Set.
* 7.
Pedestal extension switches - Set.
8.
LANDING GEAR ALTERNATE EXTENSION pump
handle - Stowed.
9.
Free air temperature gage - Check. Note current
reading.
10.
Pilot's instrument panel - Check and set.
11.
Copilot's instrument panel - Check and set.
12.
Mission panel switches and circuit breakers - As
required.
13.
Subpanels - Check and set.
14.
AC and DC GPU - As required.
*15.
BATTERY switch - ON.
16.
DC power - Check (22 VDC minimum for battery, 28
VDC maximum for GPU starts).
17.
Annunciator panels - Test.
N-3
