TM 1-1510-225-CL
E17
6. Cabin pressure switch DUMP (after cabin has
depressurized).
7. Emergency exit hatch Remove and secure.
8. Seat belts and harnesses Fasten.
9. Extension handle Stow.
10. LDG GEAR CONTROL DN.
11. LANDING GEAR RELAY circuit breaker Pull.
12. LANDING GEAR WARN horn circuit breaker
Pull.
13. Nonessential electrical equipment Off.
14. Before landing checklist Complete.
15. FLAPS As required.
16. Airspeed Normal approach speed.
17. POWER levers IDLE when landing on the
desired touchdown area is assured.
18. CONDITION levers FUEL CUTOFF.
AFTER STOPPING:
19. Fuel
FIREWALL
SHUTOFF
VALVES
CLOSED.
20. MASTER SWITCH OFF.
CRACKED WINDSHIELD
INTERNAL CRACK
1. Descend Below 25,000 feet.
2. Cabin pressure Reset pressure differential to
maintain 4.0 PSI or less as required.