TM 1-1510-224-10
MANUAL SYSTEM RESET switch.
NOTE
When the MANUAL SYSTEM RESET
switch is pressed and released, and
28 volts DC power is being applied,
the sequencer switch inside the
dispenser assembly resets, making
an audible sound as it rotates. If the
sequencer
switch
has
been
previously reset or if the switch is in
position 12 or 24, there will be no
such sound.
d.
Rotate TEST SEQUENCE switch
counterclockwise to STRAY VOLT
position.
STRAY
VOLTAGE
annunciator
(red)
should
not
illuminate.
e.
Rotate TEST SEQUENCE switch
counterclockwise to START/HOME
position.
NOTE
When turning the TEST SEQUENCE
switch to the OFF position, the
DISPENSER COMPLETE annunciator
will extinguish, the STRAY VOLTAGE
annunciator will illuminate and then
will extinguish when the OFF position
is reached.
6.
Install safety pins.
7.
Disconnect test set power cable.
8.
Remove M-91 test set from dispenser
assembly and restore in carrying case
along with power cable and hexagonal
wrench.
9.
On MFD, depress L3 until SAFE appears.
10.
Reset CHAFF counter to 30.
11.
Disconnect aircraft power by pulling 5-
ampere M130 circuit breaker located on
mission control panel (fig. 4-1).
12.
Proceed
immediately
to
ammunition
loading procedures.
4-4.
AMMUNITION.
a.
Ammunition Loading Procedure.
WARNING
Only one shipping container is to be
opened at a time. If a shipping
container has been opened and only
partially
emptied,
the
remaining
contents will be secured in the
container with an appropriate type of
packaging
material
or
filler
to
adequately prevent jostling. All
munitions in storage must be in their
original shipping containers.
1.
Place payload module assembly on work
bench in approved safe area so that the
retaining plate is facing up.
2.
Remove retaining plate by unscrewing two
retaining bolts.
3.
Insert one flare (or chaff) at a time into
each chamber of payload module.
4.
Remove plastic dust cap from each chaff
or flare.
CAUTION
Prior to insertion of an impulse
cartridge,
be
sure
there
is
a
preformed
packing
in
the
flare
cartridge.
(There
will
be
no
preformed
packing
in
chaff
cartridges.) Reinstall any preformed
packing that is inadvertently removed
with dustcap. The loading of impulse
cartridges into a flare or chaff shall
be accomplished one at a time.
5.
Insert one impulse cartridge into each
flare (or chaff).
6.
Install retainer plate assembly by screwing
the two retainer bolts into payload module.
WARNING
The system must have been tested to
ensure that there is no stray voltage
and all aircraft power must be
removed from the system prior to
loading the payload module.
7.
MFD - Bring up ASE page and depress L3
to change dispenser to SAFE.
8.
On right equipment rack, ensure safety
pins
4-9