TM 1-1510-223-10
NOTE
When turning the TEST SEQUENCE
switch
to
the
OFF
position,
the
DISPENSER COMPLETE annunciator will
extinguish,
the
STRAY
VOLTAGE
annunciator will illuminate and then will
extinguish when the OFF position is
reached.
6.
Install safety pins.
7.
Disconnect test set power cable.
8.
Remove M-91 test set from dispenser
assembly and restore in carrying case
along with power cable and hexagonal
wrench.
9.
On MFD, depress L3 until SAFE
appears.
10.
Reset CHAFF counter to 30.
11.
Disconnect aircraft power by pulling 5-
ampere M130 circuit breaker located on
mission control panel (fig. 4-1).
12.
Proceed immediately to ammunition
loading procedures.
4-4. AMMUNITION.
a.
Ammunition Loading Procedure.
Only one shipping container is to be opened
at a time. If a shipping container has been
opened and only partially emptied, the
remaining contents will be secured in the
container with an appropriate type of,
packaging material or filler to adequately
prevent jostling. All munitions in storage
must be in their original shipping containers.
1.
Place payload module assembly on
work bench in approved safe area so
that the retaining plate is facing up.
2.
Remove retaining plate by unscrewing
two retaining bolts.
3.
Insert one flare (or chaff) at a time into
each chamber of payload module.
4.
Remove plastic dust cap from each
chaff
or
flare.
Prior to insertion of an impulse cartridge, be
sure there is a preformed packing in the
flare cartridge. (There will be no preformed
packing in chaff cartridges.) Reinstall any
preformed packing that is inadvertently
removed with dustcap. The loading of
impulse cartridges into a flare or chaff shall
be accomplished one at a time.
5.
Insert one impulse cartridge into each
flare (or chaff).
6.
Install
retainer
plate
assembly
by
screwing the two retainer bolts into
payload module.
The system must have been tested to
ensure that there is no stray voltage and all
aircraft power must be removed from the
system prior to loading the payload module.
7.
MFD - Bring up ASE page and depress
L3 to change dispenser to SAFE.
8.
On right equipment rack, ensure safety
pins and flag assemblies are installed.
9.
Slide payload module assembly into
dispenser assembly and secure two stud
bolts,
using
5/32-inch
hexagonal
wrench.
b.
Ammunition Unloading Procedure.
All aircraft power to the dispenser system
must be turned off prior to removal of
payload module from dispenser assembly.
Safety pin flag shall be installed on the right
equipment rack prior to landing and the
safety pin flag shall be installed in the wing-
mounted safety switch immediately after
landing.
1.
MFD - Bring up ASE page and depress
L3 to change dispenser to SAFE.
2.
Assure safety pin and flag are inserted
in right equipment rack and in wing
mounted safety switch
4-9