f. Removal of CAL ADJ Potentiometers.
(5) Install CAL ADJ potentiometers per para-
(1) Open trimmer assembly per paragraph 4-
graph 4-16.
l0a.
g. Removal of Heater Probe Power SCR.
(2) Mark and unsolder wires from poten-
(1) Open probe controller assembly per para-
tiometer.
graph 4-10 b.
(3) Relieve tension on pot hook clip (fig. 4-27)
(2) Mark and remove wires from SCR cath-
by turning nut on potentiometer shaft.
odes and gates.
(4) Unscrew potentiometer shaft from panel
(3) Unscrew SCR from heat sink.
bushing and remove potentiometer.
(4) Install SCR per paragraph 4-17.
Section IV.
REASSEMBLY AND ALIGNMENT
4-11. Installation of Trimmer Deck Assembly.
CAUTION
Do not force circuit boards into card
cage. Circuit boards are keyed to pre-
vent insertion into incorrect con-
nectors.
a. Inspect deck gasket (91, fig. FO-7) for breaks
and deterioration and replace if necessary to ensure
a watertight seal. When replacing deck gasket,
apply adhesive (item 5, table 1-16), or an equiv-
alent, to the underneath side of the gasket to hold it
in place and assure a watertight seal.
b. Inspect the bead of sealant around the flange
of the case for creaks or voids and replace as neces-
sary with sealant (item 6, table 1-16), or an equiv-
alent, for a watertight seal.
c. Ascertain that all circuit boards and card cage
circuit card retainers are secured in place.
d. Set trimmer assembly in instrument case.
e. Use new seal screws (1, fig. FO-7) to secure
trimmer assembly to instrument case.
f. Connect BH15184A power interconnect cable
between INTERCONNECT connectors.
4 - 1 2 . I n s t a l l a t i o n o f P r o b e C o n t r o l l er
Assembly.
a. Inspect deck gasket (18, fig. FO-9) for breaks
and deterioration and replace if necessary to ensure
a watertight seal.
b. Inspect the bead of sealant at the ends and
bottom of the case divider and around the flange for
breaks or voids and repair as necessary with sealant
(item 6, table 1-16).
c. Install deck gasket, applying adhesive (item 5,
table 1-16) to the bottom side to ensure a watertight
seal.
d. Install the transformer (2, fig. FO-8) in the
bottom of the probe controller compartment using
new seal screws (4, fig. 4-29) if required.
e. Reconnect wires to cathodes and gates of
SCRs.
f. Install probe controller deck in instrument
case, using new seal screws (3).
g. Attach lid stop arm to stop arm support with
stop arm screw (12).
h. Connect BH15184A power interconnect cable
between INTERCONNECT connectors.
4-13. Installation of Switch-Power Board.
NOTE
Perform the accuracy check of para-
graph 4-6g after installing the switch-
power board.
a. Attach heat sinks to trimmer deck with six
seal screws (19, fig. FO-7).
b. Install seal nuts (17) on TEMPERATURE,
RPM, and STD DAY switch shafts.
c. Install knobs (15) on TEMPERATURE, RPM,
and STD DAY switches.
d. Install three screws (18) at each end of board
that hold connectors P6 and P7 (2, fig. 4-32) be-
tween this board the mother board.
4-14. Installation of Probe Control and Func-
tion Switch Board.
NOTE
Perform the checks of paragraphs 4-
6d, f, and h after installing the probe
control and function switch board.
a. Place non-turn washers (19, fig. FO-8) over
shafts of SPREAD and FUNCTION SELECT