TM 55-1730-201-12
57. TRAINING.
demolition operations are usually necessitated by
critical situations when time available for carrying
All operators should receive thorough training in
out destruction is limited. For this reason, it is
the destruction of the unit. Refer to FM 5-25. Simu-
necessary
that operators
be thoroughly familiar
lated destruction, using all of the methods listed
with all methods of destruction of equipment and be
above, should be included in the operator training
able to carry out demolition instructions without
program. It must be emphasized, in training, that
reference to this or any other manual.
Figure 9. Placement of Charges.
26