TM 55-1510-222-MTF
PROCEDURE
TROUBLESHOOTING
REFERENCE
c. Ice vane switches - EXTEND.
Check that VANE EXT annun-
ciator lights illuminate.
d. Ice vane power select switch -
MAIN.
BEFORE TAKEOFF
1. Autofeather switch - ARM.
2. Bleed air valve switches - OPEN.
3. Ice and rain switches - As required.
4. Fuel panel - Check fuel quantity
and switch positions.
5. Flight and engine instruments -
Check for normal indications.
6. Cabin altitude and rate-of-climb
controller - Set.
7. Annunciator panels - Check (note
indications).
8. Flaps - As required.
9. Trim - Set.
10. Avionics - Set.
11. Flight controls - Check.
12. Departure briefing - Complete.
LINE UP
1. Engine anti-ice - As required.
2. Transponder - As required.
3. Engine autoignition switch - ARM.
4. Lights - As required.
2-39