TM 10-6640-216-13&P
2-13. PREPARATION FOR MOVEMENT - continued.
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
(24)
(25)
(26)
Perform a gas alarm system test.
Empty and clean interior and exterior of refrigerator.
Ensure that refrigerator retaining bracket screws are tight.
Drain and clean gas-oil distillation unit.
Ensure that gas-oil distillation unit and shield retaining bracket screws are tight.
Drain and clean copper strip corrosion bath.
Ensure that copper strip corrosion bath retaining bracket screws are tight.
Open vacuum-air pressure stopcocks to drain vacuum-air pressure system. Close
stopcocks.
Open door cabinets No. 9 and No. 4 and remove any loose items. Store items in
designated drawers.
Check contents of all cabinets to ensure items are properly stored for shipment.
Verify the following equipment power cords are disconnected:
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
Refrigerator
Distillation Unit
Copper Strip Bath
Vacuum-Air Pressure Pump (inside cabinet No. 9)
RVP Bath
Oven
Analytical Balance
Flash Point Tester
Ice Maker (inside cabinet No. 6)
Verify that the aneroid barometer and RVP bombs have been stored in cabinet
No. 8.
Set the circuit breakers and switches in the panelboard assembly as follows:
CB1 through CB4
ON
2-48