TM 1-5855-265-20
2-3
2-4. REUSABLE SHIPPING AND STORAGE CONTAINER UNPACKING INSTRUCTIONS
This task covers unpacking a replacement unit from a type I or III reusable shipping and storage
container.
INITIAL SETUP
Personnel Required
68X Aircraft Armament/Electrical
Repairer
NOTE
One or more assistants are required to
handle the container depending upon
loaded weight stamped on container ID
plate.
Equipment Conditions
Replacement task in progress
WARNING
HEAVY OBJECT
Excessive strain can cause serious injury.
Dont: Attempt to lift or carry heavy objects
alone.
Do: Get help for lifting or carrying objects
weighing more than 35 pounds.
If you experience a sudden pain while lifting
or discomfort after lifting, get medical help at
once.
NOTE
Type I container for PNVS electronic unit
(PEU) assembly shown. Other
container is similar.
1. Get loaded container from storage.
2. Position container near helicopter.
3. Equalize pressure in container.
a. Find relief valve. See listing below:
Type
Container
Valve Location
I
Lid
III
Lower half