TM 55-4920-221-14
(5) One 1/2-pound charge on top of impedor
concealment. Salt water will do greater damage to
box.
metal parts.
154. TRAINING.
(6) One
1/2-pound
charge
between
fan
motors.
Operators should receive thorough training in
destruction of test stand. Refer to FM 5-25. Simulated
b. Demolition by Weapons Fire. Fire on stand with
destruction, using methods listed above, should be
heaviest suitable weapons available.
included in operator training program. It must be
emphasized in training that demolition operations are
153. DEMOLITION BY OTHER METHODS.
usually necessitated by critical situations when time
a. Burning. Pack rags, clothing, or canvas around
available for carrying out destruction is limited. For this
control panel and load bank. Saturate packing with
reason, it is necessary that operators be thoroughly
gasoline, oil, or diesel fuel, and ignite.
familiar with methods of destruction of equipment, and
b. Submersion. Totally submerge test stand in a
be able to carry out demolition instructions without
body of water to provide water damage and
reference to this or any other manual.
62