TM 55-1510-221-CL
FUSELAGE, LEFT SIDE, AREA 6
1.
Fuselage - Check.
INTERIOR CHECK
1.
Cargo/loose equipment - Check secure.
2.
Cabin/cargo doors - Test and lock.
3.
Emergency exit - Check secure and key removed.
4.
Mission cooling ducts - Check open and free of obstructions.
5.
Flare/chaff dispenser preflight test - Completed.
6.
KY-28/58 key loaded - As required.
7.
Crew briefing - As required.
BEFORE STARTING ENGINES
1.
Oxygen system - Check as required.
2.
Circuit breakers - Check in.
*
3.
Overhead control panel switches - Set.
*
4.
Fuel panel switches - Check.
5.
Magnetic compass - Check.
*
6.
Pedestal controls - Set.
*
7.
Pedestal extension switches - Set.
8.
Gear alternate engage and ratchet handles Stowed.
9.
Outside air temperature gage - Check, note current reading.
10.
Instrument panel - Check and set.
11.
Deleted.
12.
Mission panel switches and circuit breakers - Set and OFF.
C2 N-3