TM 55-1510-220-CL
* INTERIOR CHECK
1.
Cargo/loose equipment - Check secure.
2.
Cabin/cargo doors - Test and lock.
3.
Emergency exit - Check secure and key removed.
4.
Mission cooling ducts - Check open and free of
obstructions.
5.
Flare/chaff dispenser preflight test - Completed.
6.
Crew briefing - As required.
BEFORE STARTING ENGINES
* 1.
Oxygen system - Check as required.
2.
Circuit breakers - Check In.
* 3.
Overhead control panel switches - Set.
* 4.
Fuel panel switches - Check.
5.
Magnetic compass - Check.
* 6.
Pedestal controls - Set.
* 7.
Pedestal extension switches - Set.
8.
Gear alternate engage and ratchet handles - Stowed.
9.
Free air temperature gage - Check, note current
reading.
10.
Instrument panel - Check and set.
11.
PROP SYNC switch - OFF.
12.
Mission panel switches and circuit breakers - Set and
OFF.
13.
Pressurization controls - Set.
N-4